Physical verification

Someone goes to the factory. Ours, not theirs.

Documents can be produced on demand. A production line cannot. An on-site audit puts a salaried Business Verify auditor on the floor — no subcontracted inspector, no supplier-paid travel, no pre-arranged "showroom route".

Coverage across all major Chinese manufacturing provinces, with audits typically scheduled within 5–10 working days.

Three things an audit catches that a desk review cannot

  • A line that exists in the quotation but not in the building
  • Your order quietly subcontracted to a second, unapproved workshop
  • Hour records, safety practice and worker interviews that contradict the paperwork

Audits are not a substitute for verification — they resolve what verification leaves open. Most buyers run both.

Audit types

Five audit formats. Pick by the risk you are managing.

Most common

Initial capability audit

For a new supplier: does the site exist, is it the entity you contracted, does the capacity match the claim, and is the quality system real or decorative.

1–2 auditor-days

Compliance

Social & ethical audit

Working hours, wage payment, age-verification, health and safety, freedom of association, and forced-labour indicators. Structured for SMETA/BSCI-aligned reporting.

1–3 auditor-days

Quality

Quality system audit

Incoming inspection, in-process control, final QC, calibration records, non-conformance handling and traceability — against ISO 9001 clauses or your own code.

1–2 auditor-days

Scale-up

Capacity verification

Observed line count, cycle times, shift patterns and utilisation — converted into a plausible monthly output band rather than the supplier's own number.

1 auditor-day

Closure

Follow-up / CAPA closure

Return visit against an open findings register. We confirm each corrective action was actually implemented, and close or reopen the finding.

1 auditor-day

Unannounced

Semi-announced audit

Advance notice reduced to a same-week window. Used when a supplier has had time to stage a previous visit, or after an incident.

Subject to feasibility

On the floor

What the auditor actually does.

A checklist we publish, so a supplier cannot prepare for a version of the audit that does not exist.

Site & entity

  • Business licence at the gate matched to the contracted entity
  • Building ownership or lease term verified against the site visited
  • Registered address reconciled with the physical address
  • Signage, nameplates and any co-located entities recorded
  • GPS-stamped site photographs, entrance to dispatch

Capacity & process

  • Line-by-line walk with observed equipment, not the equipment list
  • Machine nameplates, commissioning dates and utilisation
  • Shift pattern, headcount on shift, and overtime practice
  • Work-in-progress volume and raw-material stock
  • Subcontracting indicators: missing processes, third-party packaging

Quality system

  • Incoming and in-process inspection records sampled
  • Calibration certificates for measuring equipment
  • Non-conformance logs and their closure
  • Finished-goods release control and traceability test
  • Product sample pulled and retained where permitted

People & compliance

  • Payroll and attendance records sampled against interviews
  • Age-verification files and hiring practice
  • Fire safety, PPE provision, machine guarding, chemical storage
  • Private, off-manager worker interviews where feasible
  • Environmental permits and waste handling on site

Worker interviews are conducted privately and are never attributed. If a site refuses private interviews, that itself is recorded as a finding rather than negotiated away.

Process & timing

From request to a signed findings register.

1

Scope & quote

Audit type, auditor-days, location and whether it is announced. Fixed quote including itemised travel.

Day 0–1
2

Scheduling

We book the site directly. Announced audits give 5–7 days' notice; semi-announced give a same-week window.

Typically 5–10 working days out
3

On site

Opening meeting, floor walk, document sampling, worker interviews, closing meeting with preliminary findings stated to the supplier's face.

1–3 auditor-days
4

Report & grading

Findings register with severity grading, photographic evidence, and a clear pass / conditional / fail recommendation.

5 working days
5

CAPA & closure

Supplier corrective-action plan, then an optional return visit to close or reopen each finding.

30 / 60 / 90 days
Pricing

Auditor-day based, travel billed at cost.

You see the travel line itemised. We do not mark up flights, hotels or ground transport.

Line itemRateNotes
Auditor-dayUSD 780One auditor on site for one full day, including report writing time for that day.
Lead auditor-dayUSD 950Required for social compliance, quality-system audits and any graded report.
Two-auditor team+85%Large sites, or where time on the floor is constrained.
Travel & accommodationAt costItemised with receipts. No markup, no "admin fee".
Semi-announced surcharge+20%Reflects scheduling inefficiency on our side, not access difficulty.
Follow-up visitUSD 780 + travelAgainst an existing findings register.
InterpreterIncludedOur auditors work in Chinese and English. No third-party interpreter is brought in.

Typical total, single site

USD 1,400 – 2,600 for a one-day capability or social audit in a major cluster including domestic travel.

Regional programmes

Three or more sites in one trip: travel is shared across sites and the per-site cost drops materially. Quoted per itinerary.

Bundled with verification

A Comprehensive verification plus a one-day audit is quoted as one engagement, with the desk findings handed to the auditor before travel.

Delivery standard

What the findings register looks like.

Every audit ends in a graded register, not a narrative. You should be able to turn it into a supplier action plan without translating it first.

  • Findings graded Critical / Major / Minor / Observation, each with the evidence that supports the grade.
  • Photographic evidence with timestamps, referenced to the finding number.
  • A clear recommendation: approve, approve with conditions, or do not approve.
  • Closing meeting held on site — the supplier hears the preliminary findings before we leave, not weeks later.
  • Right of reply on every finding, with the supplier's response appended unedited.
  • Signed by the lead auditor and the practice lead. Two signatures, no exceptions.

Severity definitions

  • Critical Immediate disqualification or stop-ship: forced labour, falsified certification, undisclosed subcontracting of a regulated process.
  • Major Must be corrected before volume production; a dated CAPA is required.
  • Minor Correct within the normal review cycle; tracked on the register.
  • Observation Not a non-conformance. Recorded for context and trend.

A Critical finding is reported to the buyer within 24 hours of the site visit, ahead of the full report.

Audit request

Request an on-site audit.

Tell us the site and the risk. We will come back with a scope, an itinerary and a fixed quote including itemised travel.

Scope and fixed quote returned within 1 working day.

Audit request received

Reference BV-2026-0000
We will confirm site feasibility, propose an itinerary and return a fixed quote with travel itemised within one working day.